Merry Christmas! We are closed for the Holidays from 22nd Decembe
Merry Christmas! We are closed for the Holidays from 22nd Decembe
  • Home
  • ABOUT PIR
  • Products
    • Insulation Board
    • Profile Board
    • Accessories
    • ACE Wall
  • Fixing Details
    • DIRECT FIXING
    • FIXING TO BATTENS
    • FIXING BETWEEN STUDS
    • PROFILED CUT ROOF BOARD
    • INSULATED PRECAST SYSTEM
    • WARM ROOF SYSTEM
    • NEW ROOF
    • RETROFIT
    • CEILING
  • Gallery
  • FAQ
  • Documents
  • Contact Us
  • More
    • Home
    • ABOUT PIR
    • Products
      • Insulation Board
      • Profile Board
      • Accessories
      • ACE Wall
    • Fixing Details
      • DIRECT FIXING
      • FIXING TO BATTENS
      • FIXING BETWEEN STUDS
      • PROFILED CUT ROOF BOARD
      • INSULATED PRECAST SYSTEM
      • WARM ROOF SYSTEM
      • NEW ROOF
      • RETROFIT
      • CEILING
    • Gallery
    • FAQ
    • Documents
    • Contact Us
  • Home
  • ABOUT PIR
  • Products
    • Insulation Board
    • Profile Board
    • Accessories
    • ACE Wall
  • Fixing Details
    • DIRECT FIXING
    • FIXING TO BATTENS
    • FIXING BETWEEN STUDS
    • PROFILED CUT ROOF BOARD
    • INSULATED PRECAST SYSTEM
    • WARM ROOF SYSTEM
    • NEW ROOF
    • RETROFIT
    • CEILING
  • Gallery
  • FAQ
  • Documents
  • Contact Us

INSULATED PRECAST SYSTEM

5.1 NON-COMPOSITE

■  Place PIR insulation board on freshly poured concrete immediately after leveling (within 15-30 minutes).


■  Push the pointed end through the insulation into fresh concrete until the embedment stop is even with the top surface of the insulation. 


■  Apply repetitive foot pressure on the insulation board near each tie, or otherwise vibrate the tie or the area around the tie.  


■  Place specified reinforcement and cast second layer of concrete either immediately or after the bottom layer has cured.  

5.2 VERTICAL POUR

■  Place retention clip on one side of VP tie.


■  Push the opposite pointed end through the insulation. 


■  Apply the second retention clip to the VP tie.


■  Install specified reinforcement, place assembly in forms or modular mold and cast both layers of concrete.

5.3 COMPOSITE-ACTION

■  Place PIR insulation board on freshly poured concrete immediately after leveling (within 15-30 minutes).


■  Push the pointed end through the insulation into fresh concrete until the embedment stop is even with the top surface of the insulation.


■  Apply repetitive foot pressure on the insulation board near each tie, or otherwise vibrate the tie or the area around the tie. 


■  Place specified reinforcement and cast second layer of concrete either immediately or after the bottom layer has cured.

  • Contact Us

CNZ Insulation

49 Hammersmith Drive, Wigram, Christchurch 8042

021 902 412

Copyright © 2021 CNZ Insulation - All Rights Reserved

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept